Distributed Generation Application

Please complete all fields of this application form.

Distributed Generation involves an electric interconnection with the HBPW system. Electric interconnections with the HBPW system require our engineers to evaluate the design, ensuring that no dangerous back feed can occur. This process is important to the safety of our linemen. There is a fee for an Interconnect Evaluation. The purpose of the fee is to help cover some of costs and the engineering time required for an Interconnect Evaluation.

Interconnect Evaluation Application Fee ($100) will be added to your account once this application is accepted. 

Account Information

I wish to participate in the Holland Board of Public Works Distributed Generation Program for the following account: 

Please provide the following generator information: 

 

Distributed Generation applicants must complete and sign a Generator Interconnection and Operating Agreement with Holland BPW and fulfill all requirements as specified within the agreement. All Interconnections requirements must be met prior to the effective date of a customer's participation in the Distributed Generation Program. 

A separate meter is required for Distributed Generation installations, which will be specified, furnished, installed, read and maintained and owned by Holland BPW.

Please note that costs for the Interconnection and Interconnections Study must be paid in advance (see Interconnection and Operating Requirements and Agreement).